Total delivery time consists of two parts: Production Lead Time (Manufacturing) and Ocean Transit Time (Shipping).
1. Production Lead Time
- Since heavy industrial applications require precise aerodynamic matching, our blowers are built to order.
- Standard industrial blowers are typically ready to dispatch from our factory within 2 to 3 weeks.
- Highly customized units (such as heavy-duty FRP blowers, explosion-proof models, or specialized high-temp ID fans) require 4 to 6 weeks for manufacturing and rigorous dynamic balance testing.
2. Ocean Transit Time:
Once shipped from our port in China, typical ocean freight transit times are:
- Southeast Asia: 1 to 2 weeks
- Middle East & Oceania: 3 to 4 weeks
- North America & Europe: 4 to 6 weeks